Jump to content
Credit BC Hydro

The slippery slope of Site C


Harry Swain

Posted January 29, 2021

Cascading and compounding mistakes may be leading BC to an $8-billion loss. Go to story

Credit

BC Hydro

From the category:

Spotlight on new stories

· 123 images
  • 123 images

Photo Information

  • Taken with DJI FC6310
  • Focal Length 8.8 mm
  • Exposure Time 1/640
  • f Aperture f/2.8
  • ISO Speed 500
×
×
  • Create New...